RedTeam Flex - New Submittals: Overview

RedTeam Flex has a rebuilt Submittals experience that replaces the legacy submittals tool with a faster setup process and clearer tracking of who owes the next action. This article explains what the new experience does and which projects use it.

New projects use the new experience by default, as do older projects that had no submittals. Projects that already had submittals stay on the legacy experience, so work in progress isn't affected.


What's new

The new experience covers the full submittal lifecycle in one place, from building the log to issuing the official response.

  • Build your log from a spec book. Upload a specification book and RedTeam Flex identifies submittal requirements and groups them by specification section. You review each extracted item side by side with the source document and confirm it before it is added to your log. You can also create items manually or import them from another project.

  • Track everything in one grid. Every submittal item on the project lives in a single list you can search, sort, filter, group, and customize with pinned and reordered columns. Your layout is saved automatically. The Court column shows who owns the next action on each item.

  • Build reusable review workflows. Each submittal has a configurable workflow with a submission step, as many review steps as you need, and an official response. You can set a default workflow for the whole project, or copy a workflow from one item and apply it to others in bulk.

  • Review and respond in one document. Files from you and from the submitter are merged into a single document. Reviewers apply a stamp with their response, then the submittal manager finalizes the official response, distributes it, and tracks acknowledgement of receipt.

  • Collaborate with the right people. Comment on items or documents and tag teammates. Comments marked confidential are never visible outside your company. A full history records every action taken on an item.

  • Automate follow-up. Configure reminders to go out a set number of days before or after submission and review due dates.

  • Control access. Five access levels — None, Viewer, Coordinator, Manager, and Administrator — replace the granular permission settings used by the legacy experience.


Good to know

  • Legacy submittals are not carried over. There is no migration from the legacy experience into the new log.

  • Legacy submittal views are hidden. On projects that use the new experience, the legacy submittal views and configuration options are not shown.

  • Commitments are not part of the new experience.

  • Your spec book needs to be uploaded again. A specification book uploaded in Plans & Specs is not available to submittal extraction. Upload it directly in the extraction tool.


What to do before your team starts

Work through these in order before your team starts using the log.

  1. Add everyone to Team Members first. The new experience pulls the people you can assign to submittals from the project's Team Members tab. Anyone not listed there — including subcontractors, architects, engineers, and owners — cannot be assigned to a submission or review step. This works differently from the legacy experience, so add your contacts to Team Members before you build any workflows.

  2. Review access levels. On the project's Submittals settings, each team member is given a suggested access level based on their role. Check these before anyone starts working. Two things to keep in mind:

    • You can raise someone's access level on a specific project, but you cannot set it below the default for their role. Role defaults are set per role in Configuration. Set role defaults to the lowest level a person would need, then upgrade per project.

    • External reviewers and submitters need at least Viewer to see their items.

  3. Set a default project workflow. Configure the review steps you want every new submittal to inherit, so items arrive ready to send instead of needing manual setup each time. You can rename and reorder review steps and add as many as you need. The submission and official response steps cannot be removed.

  4. Build your log. Upload a specification book to extract submittal requirements, import items from another project, or add items manually.


Projects on the legacy experience

Projects that already had submittals continue to use the legacy submittals experience, so in-progress work isn't affected.