When the GC acts as a General Contractor not at risk. Which means they are managing Subcontractors in the Owner’s name. All subcontracts, change orders and sub billings have the project Owner’s signature, but are managed by the General Contractor. Construction Manager’s benefit from RedTeam Go in every way that a regular GC would except the designee (Owner) cannot electronically sign the subcontracts or sub change orders. Subcontracts can be signed electronically by the sub and then sent to the designee (Owner) for ink signing. Sub change orders must be executed by the sub and the designee in ink. The documents can then be uploaded into the breifcase.